GBC CoWorking Space, Geneva
In a collaboration between Credit Suisse AG and Bouygues Energies & Services, a co-working space has been created in the GBC in Geneva, which was designed and implemented by WORKXSPACE.
In a collaboration between Credit Suisse AG and Bouygues Energies & Services, a co-working space has been created in the GBC in Geneva, which was designed and implemented by WORKXSPACE.
Bouygues Energies & Services provides automatic and seamless monitoring of refrigeration units at Globus Basel.
Expansion of the manufacturing and packaging plant for freeze-dried tablets – a total of one extension with an area of 5,000 m².
Im laufenden Betrieb hat Bouygues E&S Prozessautomation AG die Würz-Küche von HACO auf Industrie 4.0 getrimmt.
Our client, a chemical factory producing high-quality plastic products, commissioned us to renew their ventilation system. They required optimum air quality for their employees as well as their manufactured chemical products.
Control and instrumentation technology for one of the most modern industrial wastewater treatment plants.
Bouygues Energies & Services carried out the complete sanitary installation for two production plants during the new extension of the commercial building.
The 50 kV standard overhead power line Kappel – Oberbuchsiten reached the limits of its capacity and age after around 40 years. To maintain the operation, a new 50 kV line connection was established between the Gösgen and Oberbuchsiten substations.
The 50 kV overhead line between the Flumenthal substation, Flumenthal power station and the Luterbach substation was relaid underground on behalf of Aare Versorgungs AG (AVAG). In addition to the project and construction management, Bouygues E&S EnerTrans Ltd. also acquired all the rights to the transmission of electricity.
Since March 2017, Bouygues Energies & Services has provided all the infrastructure-related and technical facility management services in this cross-border mandate (Switzerland, Germany, France) at the Fällanden site in Switzerland and in France.
As a result of a short circuit on the factory premises of the steelworks, the 33-year-old transformer was damaged to such an extent that it had to be replaced. After a prescribed runtime of 36 hours and checking all protection and monitoring devices, the new transformer was commissioned just ten days after the damage occurred.
To meet the highest possible security standards, Roche decided to install new alarm control units. The security specialists at Bouygues Energies & Services installed two state-of-the-art alarm control units in conjunction with other trades and companies.