    Manor Verteilzentrale Möhlin

    Modernisation and expansion of the electrical distribution boards during ongoing operations.

  • Bouygues Energies & Services
    Logistics Centre STEF

    In the course of the construction of the new 8,500 m2 warehouse for fresh and frozen goods, Bouygues Energies & Services carried out extensive work in the fields of electrics, security & automation, ICT services and sanitation.

  • Bouygues Energies & Services
    Swissgrid substation

    The national grid company Swissgrid was able to start operating the 380 kV substation La Bâtiaz in Martigny after around two years of building, installation and commissioning time – thanks to Bouygues E&S EnerTrans Ltd., which was tasked with general project management.

  • Bouygues Energies & Services
    Swissgrid Ltd

    The old 220-kV outdoor substation in Veytaux that was built at the beginning of the 1970s was replaced by a new 380/220-kV substation. The new 220-kV substation is connected to the existing hydroelectric power plant Veytaux I (FHML) with a production/pump capacity of 240 MW.

  • Bouygues Energies & Services
    Coop Schafisheim

    The Coop distribution centre in Schafisheim is the model of a modern logistics centre. Here, Coop does not rely on merely innovative solutions, but also on energy-efficient and sustainable ones.

  • Bouygues Energies & Services
    Hotel Stockalperhof

    Thanks to the new voice, network and evacuation solution from Bouygues Energies & Services, the Hotel Stockalperhof is better placed to focus on its core business and cater to the individual needs of its guests.

  • Bouygues Energies & Services
    Swiss Federal Railway Line

    At Bassecourt railway station, extensive work was carried out in order to construct a second track, whose purpose was to increase the frequency of trains between Delémont and Porrentruy. During the construction of this second track, the 66 kV high-voltage line between pylons 79 and 84 was relocated to the north. The study began in 2015, and the line was completed and commissioned at the end of 2017.

  • Bouygues Energies & Services
    XL Group, Headquarters, Zurich

    WORKXSPACE carried out a tenant fit-out of 5000 m² for the headquarters of XL Insurance  Switzerland  Ltd. in the  Löwenbräuareal  .

  • Bouygues Energies & Services
    BLS AG

    Bouygues E&S EnerTrans Ltd. has built a multi-voltage test facility (MSPA) at the Spiez site for BLS AG, one of the largest transport companies in Switzerland. The facility is used for the maintenance of BLS Cargo AG multi-system locomotives.

  • Bouygues Energies & Services
    Urs Grunder, farmer

    A special CA refrigeration system for cold fruit storage was realised for farmer U. Grunder, who produces under the quality label "The Best in the Region".

  • Bouygues Energies & Services
    Mall of Switzerland

    Bouygues Energies & Services is contributing to a unique shopping experience in Switzerland's second largest shopping centre.

  • Bouygues Energies & Services
    Lüthi & Portmann Fleischwaren AG

    Cooling meat products without environmental pollution by installing two air-cooled propane cold water systems.