Swissterminal AG
Since 2013, Swissterminal has relied on our managed services in the field of network and telephony across all of its five locations.
Since 2013, Swissterminal has relied on our managed services in the field of network and telephony across all of its five locations.
To eliminate major fluctuations in temperature, Georges Riederer Transporte decided to modernise and expand its HVAC system in order to meet specific requirements.
New refrigerating plant using the natural refrigerant CO2 keeps cheese fresh and customers cool.
Modernisation and expansion of the electrical distribution boards during ongoing operations.
During the construction of the new 8,500 m² warehouse for fresh and frozen goods, Bouygues Energies & Services carried out extensive work in the fields of electrics, security & automation, ICT services and sanitation.
The national grid company Swissgrid was able to start operating the 380 kV substation La Bâtiaz in Martigny after around two years of building, installation and commissioning time – thanks to Bouygues E&S EnerTrans Ltd., which was tasked with general project management.
The old 220-kV outdoor substation in Veytaux that was built at the beginning of the 1970s was replaced by a new 380/220-kV substation. The new 220-kV substation is connected to the existing hydroelectric power plant Veytaux I (FHML) with a production/pump capacity of 240 MW.
The Coop distribution centre in Schafisheim is the epitome of a modern logistics centre. Here, Coop does not rely on merely innovative solutions, but also on energy-efficient and sustainable ones.
Thanks to the new voice, network and evacuation solution from Bouygues Energies & Services, the Hotel Stockalperhof is better placed to focus on its core business and cater to the individual needs of its guests.
At Bassecourt railway station, extensive work was carried out in order to construct a second track, whose purpose was to increase the frequency of trains between Delémont and Porrentruy. During the construction of this second track, the 66 kV high-voltage line between pylons 79 and 84 was relocated to the north.
WORKXSPACE carried out a tenant fit-out of 5000 m² for the headquarters of XL Insurance Switzerland Ltd. in the Löwenbräuareal .
Bouygues E&S EnerTrans Ltd. has built a multi-voltage test facility (MSPA) at the Spiez site for BLS AG, one of the largest transport companies in Switzerland. The facility is used for the maintenance of BLS Cargo AG multi-system locomotives.